Changes between Version 2 and Version 3 of 2025-8-21


Ignore:
Timestamp:
Aug 21, 2025, 2:24:33 PM (2 months ago)
Author:
Tom Goddard
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • 2025-8-21

    v2 v3  
    1313= Discussion Notes =
    1414
     15* Elaine work
     16 - Elaine will switch to 4 days per week (80% time) starting September 1.
     17 - Has a document online called "What I do" with info about citations, web stie, testing, docs and licensing procedures.
     18
     19* Cytoscape GPU nodes
     20 - Tom Ferrin investigating what the power and cooling requirements are for two 4-GPU nodes currently off in BH-101 to see if they can be turned on in N453 machine room.
     21 - Greg has purchase order describing those nodes: 4 Nvidia L40S GPUs, AMD Epyc 7543P 32-core CPU, 512 GB memory, 1 TB NVMe drive, 1 TB SATA SSD.
     22
     23* NAS adminstrator access
     24  - We still do not have admin access to update Synology NAS filesystem on plato.
     25  - Greg continues to try to escalate the issue with UCSF IT.
     26
     27* Foldseek
     28 - Elaine described technical details of Foldseek structure similarity searching from paper.
     29
    1530= Action Items =