Changes between Version 2 and Version 3 of 2024-7-11


Ignore:
Timestamp:
Jul 11, 2024, 1:56:59 PM (16 months ago)
Author:
Tom Goddard
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • 2024-7-11

    v2 v3  
    1111= Discussion Notes =
    1212
     13* Back tape robotics
     14  - Tom Ferrin did not get tape robotics to work.
     15  - Eric said it was broken by a label on a tape that came detached.
     16  - Tom will open case and see if anything obvious can be fixed.
     17
     18* Plato imap and ssh attacks
     19  - Greg says getting lots of IMAP and ssh attacks on plato.
     20  - Discussed using failtoban to block them.
     21
     22* Email download delays
     23  - Elaine says emails sometimes take 5 minutes to download from plato after Mac email client gives summary.
     24  - Tom Ferrin and Greg say it is probably beegfs file system temporary problems.
     25  - Greg suggests that setting up a JBOD on plato 4 nodes would allow putting mail inboxes on JBOD to improve delivery time.
     26
     27* Next group meetings
     28  - Piet will present Schol-AR demo next week July 18
     29  - TomG will present work in progress (probably foldseek) July 25
     30  - Selina is up after that and may need to be rescheduled.
     31
     32* Medical imaging raycasting
     33  - Zach fixed rendering speed with medical imaging raycasting.
     34  - May be fast enough for use in VR.
     35
     36* Total Segmentator
     37  - We don't qualify for academic license.
     38  - License fees are prohibitive (tens of thousands of dollars per year).
     39
     40* Web services
     41  - Zach working on allowing web services to queue a job on Wynton.
     42  - Zach needs ability to run wynton jobs enabled
    1343
    1444= Action Items =