Changes between Version 42 and Version 43 of NIAID2023


Ignore:
Timestamp:
Dec 21, 2023, 2:13:30 PM (22 months ago)
Author:
Elaine Meng
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • NIAID2023

    v42 v43  
    5454Darrell: one of the items in the current SOW is supporting wide displays.  Just wanted to mention our video wall is two 4Ks next to each other, where each is an aspect ratio that is standard to some extent. So that work will be valuable to others, not just us.
    5555
    56 Scooter: re scheduling a visit to your lab soon.  Can we make it happen in January or February?  Darrell: I saw something like $15K allotted for 3 people, seems high.  Scooter: we'll go with our actual expenses and it should be much less than that. Darrell: The week of Feb 19-23 has opened up since our retreat was canceled. First week of Feb some of us were traveling to visit another person.  Scooter: Feb 19-23 is mostly open, I'll get together some numbers. Phil: the preceding week (Feb 12->) would also work. Darrell: oh, Feb 19 is holiday, maybe Feb 12-16 or Feb 20-23. We could advertise a seminar and/or set up demos in the atrium. Scooter: we can bring some Quest3s and also show interactive VR with medical imaging.  Darrell: would like to have a nice dinner too. Scooter: I wouldn't be able to make if it Feb 12-16, will be in Copenhagen.  Darrell: with the contract ending it will be important to get the expenses submitted promptly. I can recommend a hotel in walking distance, but Nada may have advice about other possibilities. Darrell: It’s the Hilton in Rockville, MD: 1750 Rockville Pike, Rockville, MD 20852
     56Scooter: re scheduling a visit to your lab soon.  Can we make it happen in January or February?  Darrell: I saw something like $15K allotted for 3 people, seems high.  Scooter: we'll go with our actual expenses and it should be much less than that. Darrell: The week of Feb 19-23 has opened up since our retreat was canceled. First week of Feb some of us were traveling to visit another person.  Scooter: Feb 19-23 is mostly open, I'll get together some numbers. Phil: the preceding week (Feb 12->) would also work. Darrell: oh, Feb 19 is holiday, maybe Feb 12-16 or Feb 20-23. We could advertise a seminar and/or set up demos in the atrium. Scooter: we can bring some Quest3s and also show interactive VR with medical imaging.  Darrell: would like to have a nice dinner too. Scooter: I wouldn't be able to make if it Feb 12-16, will be in Copenhagen.  Darrell: with the contract ending it will be important to get the expenses submitted promptly. I can recommend a hotel in walking distance, but Nada may have advice about other possibilities. Darrell: It’s the Hilton in Rockville, MD: 1750 Rockville Pike, Rockville, MD 20852.  Via email: I think we had a great conversation during today’s meeting. I confirm this task order with the changes we talked about in the meeting as well as travel to Maryland during the week of February 19-23 (although some flexibility on those dates is okay, too).
    5757
    5858NIH3D:
    5959Kristen: Phil, this was an entry that had DNA only that we were talking about: https://wfe-app-testing.threed.niaiddev.net/entries/3DPX-020164  ... if no protein (nucleic only), we should omit the Coulombic and secondary structure displays.  Rainbow is single color, unclear why. Also: nucleotide representations should be same color as ribbon. Elaine, Eric: those are probably bugs, will look into it.
    6060
    61 Phil: SteamLink is much more robust than using AirLink.
     61Phil: SteamLink is much more robust than using AirLink. Discussion of technical setup issues.
    6262
    6363== 12/7/2023 ==