Changes between Version 1 and Version 2 of 2026-3-12


Ignore:
Timestamp:
Mar 13, 2026, 12:59:57 PM (5 hours ago)
Author:
Tom Goddard
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • 2026-3-12

    v1 v2  
    1313= Discussion Notes =
    1414
     15* Hiring an Elaine replacement
     16 - Eric summarized Elaine's main duties in the lab: documentation, quality control, licensing.
     17 - Made compelling case that these are essential and we may need to hire a replacement if funding permits.
     18 - We do not have a good alternative without Elaine for quality control.
     19 - Tom Ferrin notes any hiring decision would have to be after seeing if R35 and R24 grants are awarded.
     20 - Scooter proposed that when endowed chair position filled, the lab may submit an R24 grant proposal.
     21
     22* Endowed chair
     23 - Tom Ferrin reports that posting advertisements for filling RBVI endowed chair position is on hold because of UC-wide migration to Oracle HR management system.
     24 - Not clear when next steps on filling endowed chair will be possible.
     25
     26* PDB web accessibility remediation
     27 - RBVI web site siteimprove score is 97%
     28 - 30 PDFs and 300 videos still flagged by UCSF accessibility project.
     29 - Greg tried AI PDF fixing tool on Wrappy paper.  Added meta data, mangled title.
     30 - Tom Ferrin notes that UCOP accessibility FAQ allows an exception marked archival PDFs and videos.
     31
     32* Toolshed database performance
     33 - Toolshed MariaDB instance was using 50% CPU.
     34 - Greg saw 500K https GET queries on ToolShed in 10 days, and 300K involved database query.
     35 - Most database queries no return cached result.
     36
     37* Wynton admin scripts migration to plato
     38 - Greg is migrating account administration scripts from Wynton back to plato.
     39 - Wynton BeeGFS contract expires March 2027.
     40 - Expected that Wynton may be shutdown in 1 year.
     41
    1542
    1643= Action Items =