Changes between Version 1 and Version 2 of 2022-3-24


Ignore:
Timestamp:
Mar 24, 2022, 12:38:43 PM (4 years ago)
Author:
Tom Goddard
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • 2022-3-24

    v1 v2  
    1515= Discussion Notes =
    1616
     17* Scooter and Elaine move to N453
     18  - Department asked Scooter and Elaine to move to N453.
     19  - Will happen in coming weeks.
     20
     21* Phenix R24
     22  - Eric gave overview of Phenix and R24 proposal ChimeraX tasks
     23  - Showed demo of ChimeraX phenix douse command.
     24  - Discussion of whether Phenix REST server of subprocess call should be used to run Phenix methods.
     25  - Many disadvantages of REST, starting server, determining when it is ready, polling it, shutting it down.
     26  - Does not seem like Phenix has persistent state that would make REST attractive.
     27  - One advantage of REST would be having Phenix running on a different machine (cluster).  Rare case.
     28  - Scooter discussed DASK for parallelizing Python numpy/pandas jobs on a cluster like wynton, or on local cores.
     29
     30* Slow downloads of ChimeraX
     31  - Elaine and TomG have 15-30 minute ChimeraX download times this week from home.
     32  - Both using sonic.net, but have fast connection to other sites.
     33  - Tom Ferrin and Scooter (comcast) had fast download times this week.
     34  - Greg (sonic) and Zach (comcast) have not tried yet.
     35  - Scooter notes entire UCSF Mission Bay campus has only 10 Gbit/sec internet connection.
     36
     37* Wynton BeeGFS problem
     38  - Last week multiple day downtime was caused by BeeGFS file system bug, metadata server deadlock.
     39  - Caused by a single job from Schoichet lab using BeeGFS for scratch.
     40  - This job has been changed to use local disk scratch like all other jobs.
     41  - Giving BeeGFS vendor  test case so they can patch it.
     42
     43* New Wynton GPUs
     44  - 13 new Wynton GPU nodes just received, 4 A40 GPUs each (48 GB each).
     45  - Brings Wynton GPUs from about 150 to 200.
     46  - Nvidia announced new H100 GPU with 80 GB.  Also RTX 4000 series expected in September 2022.
     47
    1748= Action Items =
    1849